Project Description

Improvement of existing road network in addition to the construction of a 968m asphalt carriageway. A dual configuration road composing of one lane for each direction with a width of 2.75m.
Concrete barriers and retaining walls were used due to the complexity of the natural environment.
The project includes the design and construction of a 3-spam culvert with dimensions 21.60m x 17.00m.
Preliminary and Detailed Design were implemented.

Project Information

  • Client: Management of Technical Projects of Samos island
  • Location: Ikaria, Greece
  • Date/Period: 2018
  • Project Value: 1,100,000 €
  • Status of Project: COMPLETED